A fair comparison starts with the whole storage route.

Compare geobags, mechanical filtration and wet tailings storage on the same dry-tonne basis. Include operating costs, upfront capital, staged storage and the work needed to reach final placement.

A strong case for smaller mines

Dewater and deposit in the same operation.

When filled in their permanent position, geobags combine dewatering and final storage. Enclosed fines produce less windblown dust, the bags reduce direct rainfall rewetting, and passive drainage keeps the equipment simple.

Bag purchases progress with production. Compare that cashflow with the initial filtration plant investment and the subsequent transport, conditioning and placement of filter cake.

Read the complete technical article

Review the tailings testing, layout and supply pathway with Kontain.

Your site. Your inputs.

Tailings Cost Comparison

Start with the selected differences, then review the full project. Test plant capital, footprint and standby-pad allowances, labour productivity and the placement break-even rate.

Powered by Kontain’s live calculator.
Free access, editable inputs and downloadable scenarios.

Open full screen on Kontain

If the embedded view does not load, open the calculator directly on Kontain. Examples are not quotations. Use Save scenario to keep a portable copy; browser storage may differ between embedded and full-screen views.

From cost to layout

Develop the stack behind the numbers.

Use Kontain’s geobag design tools to explore layout and capacity, then review the site-specific geometry, drainage and operating sequence with us.